BidCost Estimating

BidCost Estimating logo - construction estimating and quantity takeoff services

TURNAROUND TIME 24-48 HOURS!

Thermal & Moisture Protection Estimating

Roofing, insulation, waterproofing and sealant estimates (CSI Division 07) for US contractors

Thermal and moisture protection covers everything that keeps a building dry and energy-efficient: roofing, insulation, waterproofing, air barriers and sealants. These scopes are full of layers, laps and accessories that are easy to miss. BidCost Estimating prepares detailed Division 07 takeoffs and estimates in 24–48 hours, so your bid covers the full system.

We work with roofing contractors, insulation and waterproofing contractors, building envelope specialists and general contractors across the United States.

What Our Division 07 Takeoff Includes

Roofing: Roof area in squares for TPO, EPDM, PVC, modified bitumen, built-up, asphalt shingle and metal roofing, with cover board, insulation, flashing, edge metal and coping.

Insulation: Batt, blown-in, rigid board and spray foam insulation by area and R-value for walls, roofs and floors.

Waterproofing: Below-grade and plaza waterproofing, sheet and fluid-applied membranes, drainage board and protection board.

Air and vapor barriers: Fluid-applied and self-adhered air and vapor barriers, with transitions at windows and openings.

Joint sealants and firestopping: Linear feet of sealant joints by type, and firestopping at rated wall and floor penetrations.

Siding and wall panels: Fiber cement siding, metal wall panels and trim, when they are part of your Division 07 scope.

How Our Estimating Process Works

1. Send your plans: Upload roof plans, wall sections, details, specs and the bid date.

2. Assembly review: We study roof and wall assemblies, insulation R-values and manufacturer system requirements in the specs.

3. Digital takeoff: Roof areas, wall areas, flashing and joints are measured with digital takeoff software, including slopes and penetrations.

4. Pricing: Material and labor are priced with current local US rates for each system.

5. Delivery: You receive an Excel estimate by system and area, plus color-coded marked-up plans.

Envelope Projects We Estimate

Our thermal and moisture protection estimating covers projects such as:

  • Commercial low-slope roofing and re-roofs
  • Residential shingle and metal roofing
  • Foundation and below-grade waterproofing
  • Building envelope and air barrier systems
  • Insulation for new homes and commercial buildings
  • Sealant and firestopping packages

Why Envelope Contractors Choose BidCost

Complete system takeoffs: We include every layer of the assembly, not just the top membrane or the face of the wall.

Accessories counted: Flashing, edge metal, drains, curbs and penetrations are counted so they do not eat into your margin.

Fast turnaround: Most Division 07 estimates are delivered within 24–48 hours.

Organized by system: Quantities grouped by roof area, wall type or system are easy to review and send to suppliers.

Thermal & Moisture Protection FAQs

What is Division 07? Division 07 in the CSI MasterFormat covers thermal and moisture protection: roofing, insulation, waterproofing, air barriers, sealants and similar work.

Do you measure roofing in squares? Yes. Roof areas are given in squares (100 sq ft), with slope factors applied for pitched roofs.

Can you estimate only roofing or only insulation? Yes. We can estimate any single Division 07 scope or the full building envelope.

How long does an estimate take? Most Division 07 estimates are delivered in 24–48 hours.

Helpful guide: new to takeoffs? Read What Is a Quantity Takeoff in Construction? to see what a takeoff includes and how it differs from a cost estimate.

Ready to bid your next roofing, insulation or waterproofing project? Send us your plans today and get an accurate estimate from BidCost Estimating. Call +1 (786) 783-4354 or email info@bidcostestimating.com for a free quote.